LIGNEC

SAINTE-MARGUERITE WIND FARM

Global installation mandate of the 35kV collector network (installation of 62 km of optical fiber, Jetting)

  • Buried duct installation
  • Fiber cable blowing
  • Installation at ground level of junction boxes
 
 
 
Transmag