Some of our achievements

YELLOW FALLS

Detailed electrical engineering for the new Yellow Falls power station and interconnection substations.

  • Over a two-year period (2015–2017)
  • 16.4 MW hydroelectric power station developed by Boralex located on the Matagami River in Ontario
  • Lignec served as the prime contractor in charge of supply, management, and installation
  • Gemitech provided detailed studies and engineering for the plant, the plant substation (13.8/44kV), and the interconnection substation (44/120kV)
 
 
 
Transmag